Final Inspection
Today I received a call confirming our final inspection walk through was happening at 2.00pm this Thursday. Hopefully Stegbar sort out the wardrobes by Wednesday and the painters can address the few outstanding things left over. The sparkys need to come and install a couple of conduits to run out to the private sewer system and that's about it.
I will keep you all posted!
I will keep you all posted!
Saturday, 3 March 2012
The 11th Hour
The construction fences are down and the port-a-loo is gone which can hopefully only mean one thing and that is it's nearly over! Our biggest hold up is waiting for Stegbar to come out and replace our built in robes which is due to be done by Wednesday. In between now and then we need to really finish the "finished" painting which is still lacking in a few places. I saw that the doors all appear to be finished really well except for the last foot which has only been roller finished and the difference in the painted finish is enormous. The poor plasterers who are fantastic blokes and have been back far too many times courtesy of other trades will again need to come back and repair some more small patches. We have a bit of missing grouting to be completed and more grout to be cleaned out of all the floor drains. There is also some painted plaster that really needed to be sanded BEFORE being painted!
It seems all of our electricals have been sorted out with the exception of two light switches. One I have given up on but the other located in the main bathroom will still need to be addressed as the gyprock it is fastened to is not secure and needs to be repaired courtesy of our second fix sparkys. I also got a letter last week from the electricity supplier defecting some electrical work between the main and the house and this has also been passed up the chain to sort it out.
I'm beginning to feel tired and with tiredness becomes impatience. As I have now commenced my leave as we had planned to hand over last week perhaps I may need to get out there with the stock prod and keep things moving along at a sufficient pace.
It seems all of our electricals have been sorted out with the exception of two light switches. One I have given up on but the other located in the main bathroom will still need to be addressed as the gyprock it is fastened to is not secure and needs to be repaired courtesy of our second fix sparkys. I also got a letter last week from the electricity supplier defecting some electrical work between the main and the house and this has also been passed up the chain to sort it out.
I'm beginning to feel tired and with tiredness becomes impatience. As I have now commenced my leave as we had planned to hand over last week perhaps I may need to get out there with the stock prod and keep things moving along at a sufficient pace.