Thursday, 28 February 2013

And on the Two Hundredth Day................

And on the Two Hundredth day the Gods of technology said unto the people "Thou Shalt Have Internet"! So its been a long time between posts but the pace has been constant. Let me bring you all up to speed but to do so we need to go back to the day of "Bazinga".

In the days leading up to Bazinga, we had arranged our flooring and pool for the days closely following so delaying our handover was not an option. I had taken leave from work that I could not delay any longer and had already burnt a week of it already with some issues with our SS. I got a call out of the blue from an "Independent" building inspector that had been organised by MDJ to do our final walk through with rather then our SS which I was more then happy with. He gave me a bit of background about himself, his company and that it was quite "Routine" for him to do a final walk through as a bit of QA for MDJ.

As you may be aware if you have read our previous posts there was not a great deal of issues to address as we had been having them corrected as they arose. However there we some painting issues, flashing adjustment, mortar and other cosmetic issues that we were intent or raising. As we commenced our walk through with the "Independent" it soon become aware that he was not exactly batting down the middle. It became very apparent and I might add on occasion quite rudely so that he had zero interest in anything we raised. Halfway though our inspection our SS and the painters turned up which made it even more difficult and off putting. To his credit though our SS did rectify a number of issues that the inspector was keen to dismiss.

On completion of the handover, a cheque was exchanged for keys and it was finally ours. In the days following handover I must say that our SS became a different person and any little enquiry we made was dealt with and rectified swiftly with the professionalism that we had only half hoped for during our entire build. We just wish it had been this way with him from the get go!

As this was just about the end of dealings with MDJ I thought to myself "Would I do it all again and if so would I with MDJ"? The short answer.......... Yes! Apart from some poor tradies and a difficult and poor communicating SS MDJ were people of their word.

I cannot express well enough the commitment and dedication to her clients that we were shown by our client liaison Suzz. The was not one single thing that she was not able to organise, answer or enquire about on our behalf and she truly took a huge amount of stress and anxiety out of our build. Suzz you are a credit to MDJ and even after nearly a year in our new home we still are indebted to you.

Our SS boss Mick is an old school (Note I didn't suggest you were old Mick) fellow and one of old principles and morals. You came to us at a shitty time in our build not with arguments or defenses but with a desire to solve issues and progress the build to a level not only you but also we were over the moon with. We truly appreciate the efforts and lengths you went to in helping us with our build Mick, you are truly a great bloke.

Whilst we only had a few visits and conversation with Bill McDonald, to get the owner of a company out on site actively wanting to listen and then address his clients concerns is outstanding. Thanks Bill we really appreciated your time and openness.

So whilst we were at the end of our build, we soon realised that our journey was no where near its end. Now it was our problem to organise everything else, lawns, pool, deck, other fixings inside, lights, driveways etc and the list goes on!

 


Sunday, 11 March 2012

Bazinga!

We have the keys ................................................

Monday, 5 March 2012

Final Inspection

Today I received a call confirming our final inspection walk through was happening at 2.00pm this Thursday. Hopefully Stegbar sort out the wardrobes by Wednesday and the painters can address the few outstanding things left over. The sparkys need to come and install a couple of conduits to run out to the private sewer system and that's about it.

I will keep you all posted!

Saturday, 3 March 2012

The 11th Hour

The construction fences are down and the port-a-loo is gone which can hopefully only mean one thing and that is it's nearly over! Our biggest hold up is waiting for Stegbar to come out and replace our built in robes which is due to be done by Wednesday. In between now and then we need to really finish the "finished" painting which is still lacking in a few places. I saw that the doors all appear to be finished really well except for the last foot which has only been roller finished and the difference in the painted finish is enormous. The poor plasterers who are fantastic blokes and have been back far too many times courtesy of other trades will again need to come back and repair some more small patches. We have a bit of missing grouting to be completed and more grout to be cleaned out of all the floor drains. There is also some painted plaster that really needed to be sanded BEFORE being painted!

It seems all of our electricals have been sorted out with the exception of two light switches. One I have given up on but the other located in the main bathroom will still need to be addressed as the gyprock it is fastened to is not secure and needs to be repaired courtesy of our second fix sparkys. I also got a letter last week from the electricity supplier defecting some electrical work between the main and the house and this has also been passed up the chain to sort it out.

I'm beginning to feel tired and with tiredness becomes impatience. As I have now commenced my leave as we had planned to hand over last week perhaps I may need to get out there with the stock prod and keep things moving along at a sufficient pace.

Friday, 24 February 2012

Almost a Home???

Today was the first time I had been to site and honestly felt that the end was finally in sight. Our bathrooms are all complete with the exception of final paint finishes. Our kitchen has been repaired with the exception of some small issues with one of the plinths which will be addressed early next week. A number of door jambs need to come out and be replaced due to some splitting issues and that should be completed by early next week.

Some realignment of the front fascia was needed after we had one of our brick pillars redone and this may have been completed late today. It's all now starting to come together but we just need to keep knocking down some of the other smaller issues to tidy things up.

We managed to get a few quotes for the driveway and need to book in our trades to have our flooring installed but again we need to sort out some firm dates first.

Saturday, 18 February 2012

Deja Vu

Today saw the completion of our wet area floors after being redone due to some tiling errors. From first glance they appear to have been done really well and I am quite chuffed with the finished product. It will be nice to see them when they are all cleaned up so here's hoping they will look even better. We have had all of our skirting completed and now only have a few of the architraves still to be replaced. Our new laundry tub is in and our other replacement bit and pieces have been ordered and are due to arrive early next week.

Our last brick window sill was also completed today and appears to be much better then the last attempt and a number of our small mortar defects have also been rectified. If all goes to plan apparently the construction side of things should be completed early next week with only painting matter to then be addressed.

The list is getting shorter which is great to see, but we still have a little way to go yet.

Wednesday, 15 February 2012

Treading Water......

And so we are back from the darkness and hopefully moving ahead with no other mishaps as we look towards the light at the end of the tunnel. We had some issues that we appear to have overcome and fingers crossed we will not incur any more. I don't really want to dwell on the issues other then to say they were with contractors and their standard of work. When these issues were raised with MDJ they were dealt with and are presently in the process of being rectified.

Our column has been redone and looks far better then the former. The windows sills are predominantly complete with one still a work in progress. The wet area floors are nearly done and are a vast improvement on the original. The pantry door has been replaced and the front door repaired. Today saw the installation of our glass splashback and to be honest it looks "Shit hot"!

Hopefully over the next few days we will see a lot more progress.